Dzhankeldy Wind Power Project
Table 2-9 Vehicles & Construction Equipment During the Construction Phase
Download 6.64 Mb. Pdf ko'rish
|
56086-001-esia-en
Table 2-9 Vehicles & Construction Equipment During the Construction Phase
N AME Q UANTITY T YPE OF F UEL 750t crawling crane 1 Diesel 150t crawling crane 1 Diesel Hydraulic lifting device and lifting frame 1 Electrical 250t crawling crane 1 Diesel 50t crawling crane 1 Diesel 50t truck crane 1 Diesel Gantry crane 2 Electrical Truck 3 Diesel Forklift 2 Diesel Diesel generator 1 Diesel Tower crane 2 Electrical Vehicle crane 2 Diesel Wheel loader 1 Diesel Backhoe excavator 7 Diesel Crawler bulldozer 1 Diesel Road roller 2 Diesel Dump truck 10 Diesel Platform lorry 1 Diesel Batch plant 2 Electrical Concrete pump truck 3 Electrical Concrete delivery truck 6 Electrical Piling machine 4 Diesel Note: The equipment/machinery listed above is anticipated to be used by the EPC Contractor only. The sub-contractors are expected to have additional equipment/machinery depending on their area of work. The final selection of equipment/machinery might slightly differ from those proposed in the table above Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 78 2.5 Project Operations & Maintenance Requirements W IND F ARM The duration of the PPA is 25 years from the Project Commercial Operation Date and operations and maintenance activities will be undertaken by The First National Operations and Maintenance Company (NOMAC), a wholly owned subsidiary of ACWA Power. The operation of the wind farm will require limited operational activities such as the following: Operation and maintenance to include normal daily operation of equipment including maintenance (electromechanical and housekeeping) to optimise energy yield and life of the system; Remotely activated turbine shutdown during excessive wind speeds; Management of operations in relation to resident bird and bat species and migration periods during Spring and Autumn. W ORKFORCE The operation of the wind farm is likely to be monitored and controlled from a remote location, as such, only a limited number of operational workforce are likely to be required. At this stage, it is understood that about 35-40 workforce will be engaged to carry out operation and maintenance activities of the wind farm. Download 6.64 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling