It is anticipated that diesel electric power generators will be used as the source of electricity 
during construction and as backup. Currently, it is estimated that the total electricity 
consumption during the construction phase will be approximately 6,605,515.20 kw/h. It is 
estimated that about 10,500 litres of diesel will be used per month. However it should be noted 
that the total electricity consumption and quantity of diesel to be used per month has not 
been confirmed by the EPC Contractor. 
W
ATER 
S
UPPLY
 
During site preparatory stage, the project will require potable water supply for the construction 
facilities & activities. The expected volume of water for construction activities in approximately 
30,000m
3
. It is anticipated that project personnel will use approximately 80,000m
3
of water. 
A licensed potable water supply company will supply the water required to cover the water 
demand of the Project (both for construction activities and for use by project personnel) to 
the site via water tanker trunks. 
S
ANITARY 
F
ACILITIES
 
The site will require on site sanitation facilities for the construction workers (expected to be 
toilets and washrooms with collection septic tanks). Sanitary wastewater will be stored in 
bunded septic tanks on-site, prior to removal by a licensed contractor for treatment at licensed 
facilities off-site.
2.4.4 
Workforce 
Requirements for construction workforce are yet to be finalised. At this stage it is understood 
that about 700-1000 personnel will be involved during peak construction periods of the Wind 
Farm and OHTL (about 50-100 personnel will be involved in the OHTL construction). This will 
comprise a combination of Project Company, EPC Contractor and sub-contractor staff. Out 
of these 700-1000 personnel, about 350 - 500 will be employed from the local workforce and 
female workers will make up about 5% of the total workforce i.e. 35 
– 50 female workers. 
The figure below provides the indicative organizational chart of the EPC Contractor.


Dzhankeldy 500MW Wind Farm 
ESIA Volume 2- Main Text, Tables & Figures 
75 

Download 6.64 Mb.

Do'stlaringiz bilan baham:
1   ...   48   49   50   51   52   53   54   55   ...   203




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling