Figure 2-19 Layout of Proposed Routing of Internal Access Road (ref. Black Lines 
 


Dzhankeldy 500MW Wind Farm 
ESIA Volume 2- Main Text, Tables & Figures 
62 
33
K
V
 
OHTL 
A 33kV overhead transmission line will run from the western plot to the eastern plot of the 
Project site. This OHTL will be developed to enable connection of the western wind farm to a 
33kV substation located at the eastern plot of the wind farm(see description below). From the 
33kV substation, power will be transferred to a 500kV single circuit OHTL as described in sub-
section 2.3.2 below. 
33/500
K
V
 
S
UBSTATION 
 
A 33/500kV AIS sub-station is proposed at the eastern plot of the Wind Farm. The sub-station 
will be approximately 200m X 200m with an area of approximately 39,900m
2
. The substation is 
proposed to be located at the left side of an existing road within the site. The existing road will 
be approximately 600m in the right direction of the proposed substation location enabling 
access to the substation during construction & maintenance works.
The figure below shows the proposed location of the substation. 
Figure 2-20 Proposed Location of 33/500kV Substation Within the Eastern Plot 
A
CCESS 
R
OAD
 
The primary link to the Project site will be via an existing asphalt access roads south of the 
Project site and runs through the Project site from the west to the northern extent of the eastern 
plot. This access road links to Highway A380 and is mainly used by Dzhankeldy and Kalaata 
residents located near the Wind Farm.


Dzhankeldy 500MW Wind Farm 
ESIA Volume 2- Main Text, Tables & Figures 
63 
Given the presence of potholes and elevation differences along the access road, it is 
anticipated that local improvements works such as backfilling and compaction will be 
undertaken to ensure the road is adequate and suitable to facilitate transportation of project 
components, equipment & workers to the site. 

Download 6.64 Mb.

Do'stlaringiz bilan baham:
1   ...   40   41   42   43   44   45   46   47   ...   203




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling