Dzhankeldy 500MW Wind Farm
ESIA Volume 2- Main Text, Tables & Figures
62
33
K
V
OHTL
A 33kV overhead transmission line will run from the western plot
to the eastern plot of the
Project site. This OHTL will be developed to enable connection of the western wind farm to a
33kV substation located at the eastern plot of the wind farm(see description below). From the
33kV substation, power will be transferred to a 500kV single circuit OHTL as described in sub-
section 2.3.2 below.
33/500
K
V
S
UBSTATION
A 33/500kV AIS sub-station is proposed at the eastern plot of the Wind Farm. The sub-station
will be approximately 200m X 200m with an area of approximately 39,900m
2
. The substation is
proposed to be located at the left side of an existing road within the site. The existing road will
be approximately 600m in the right direction of the proposed substation
location enabling
access to the substation during construction & maintenance works.
The figure below shows the proposed location of the substation.
Figure 2-20 Proposed Location of 33/500kV Substation Within the Eastern Plot
A
CCESS
R
OAD
The primary link to the Project site will be via an existing asphalt
access roads south of the
Project site and runs through the Project site from the west to the northern extent of the eastern
plot. This access road links to Highway A380 and is mainly used by Dzhankeldy and Kalaata
residents located near the Wind Farm.
Dzhankeldy 500MW Wind Farm
ESIA Volume 2- Main Text, Tables & Figures
63
Given the presence of potholes and elevation differences
along the access road, it is
anticipated that local improvements works such as backfilling
and compaction will be
undertaken to ensure the road is adequate and suitable to facilitate transportation of project
components, equipment & workers to the site.