Dzhankeldy Wind Power Project


Project Auxiliary Facilities


Download 6.64 Mb.
Pdf ko'rish
bet43/203
Sana13.09.2023
Hajmi6.64 Mb.
#1676820
1   ...   39   40   41   42   43   44   45   46   ...   203
Bog'liq
56086-001-esia-en

2.3.1.2
Project Auxiliary Facilities
Auxiliary facilities for the Project will include: 
 
Site entrance and security building 
 
Administration building, offices and amenities
 
Central Control Room
 
Warehouse and stores
 
Security 
 
Lighting 


Dzhankeldy 500MW Wind Farm 
ESIA Volume 2- Main Text, Tables & Figures 
60 
 
Other mobile plant and vehicles
 
Internal access roads between turbines 
 
33kV OHTL 
 
33/500kV sub-station 
 
External access road and
 
Electrical connections 
I
NTERNAL 
A
CCESS 
R
OAD
 
Existing roads within the Project site will be used for the Project. Where there are no roads to 
reach certain WTG locations on site, additional internal access roads between turbines will be 
developed by the EPC Contractor to enable easy access within the Project site. These internal 
access roads will be routed such that impact to environmental sensitivities such as water flow 
paths, etc. will be minimised.
The internal roads will be developed such that they are adequate and suitable to connect to 
the existing road network external to the southern extent of the Project site in order to facilitate 
transportation of equipment & workers to and within the site. 
The design of the internal roads will ensure that vehicles will be able to manoeuvre easily on a 
continuous sequence in order to allow vehicle access to cross the different areas of the 
western & eastern plots to reach the WTGs. 
The internal access roads will be 6m wide including shoulders 0.5 +0.5m on either side.


Dzhankeldy 500MW Wind Farm 
ESIA Volume 2- Main Text, Tables & Figures 
61 

Download 6.64 Mb.

Do'stlaringiz bilan baham:
1   ...   39   40   41   42   43   44   45   46   ...   203




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling