The Township of East Brunswick was established in 1860. Since January 1, 1965, the


Download 8.87 Mb.
Pdf ko'rish
bet21/115
Sana05.08.2017
Hajmi8.87 Mb.
#12784
1   ...   17   18   19   20   21   22   23   24   ...   115

Residential:

a.   Flat rate system: Fifty Dollars ($50.00).   [Amended 9-26-05 by Ord. No. 05-28;  

                               6-25-07 by Ord. No. 07-20]

Com m ercial/Industrial:

b.   One (1) to fifteen (15) devices: One Hundred Dollars  ($100.00). [Amended 9-26- 

                  05 by Ord. No. 05-28; 6-25-07 by Ord. No. 07-20]

c.   Each additional five (5) devices:  Ten Dollars  ($10.00). [Amended 6-25-07 by    

                             Ord. No. 07-20]

d.   Control panel - each: Seventy Five Dollars  ($75.00). [Amended 6-25-07 by Ord. 

                                No. 07-20]

e.  Related equipment:  see fee schedule.

7508

    9-07


& 75-3

CONSTRUCTION CODES, UNIFORM

& 75-3

(13)


Trailers:  each unit: One Hundred Dollars ($100.00).  [Added 8-24-92 by Ord. No. 92-

31; amended 9-26-05 by Ord. No. 05-28]

(14)

Mobile homes:  each unit: One Hundred Dollars ($100.00).  [Added 8-24-92 by Ord.



No. 92-31; amended 9-26-05 by Ord. No. 05-28]

(15)


Modular homes:  apply fee schedule.  [Added 8-24-92 by Ord. No. 92-31]

(16)


Modular office panels:  each unit: Twenty-five Dollars  ($25.00).  [Added 8-24-92 by

Ord. No. 92-31; amended 9-26-05 by Ord. No. 05-28]

(17)

Temporary  installations  and  displays:    Display  booth  and  temporary  installation. 



[Added 8-24-92 by Ord. No. 92-31; amended 6-25-07 by Ord. No. 07-20]

a.  Less than 30 days/each unit:  Twenty Five Dollars  ($25.00). [Amended 6-25-07 

                               by Ord. No. 07-20]

b.  More than 30 day/each unit:  Apply fee schedule.

(18)

Elevator:  [Added 8-24-92 by Ord. No. 92-31; amended 6-25-07 by Ord. No. 07-20]:



a.  High voltage/each unit: One Hundred Fifty Dollars  ($150.00). [Amended 9-26-05 

                               by Ord. No. 05-28; 6-25-07 by Ord. No. 07-20]

b.  Low voltage/each unit:  apply fee schedule.

(19)


There shall be a minimum charge for any  electrical subcode permit and utility loan

management device inspection of Thirty Dollars ($30.00).  [Added 8-24-92 by Ord. No.

92-31;  amended 4-11-94 by Ord. No. 94-20]

 

(20)



Change of Contractor after a Permit is Issued: Twenty Dollars ($20.00). [Added 9-26-

05 by Ord. No. 05-28]

(21)

Disconnection of Service with Structure Demolition: Fifty Dollars ($50.00) [Added 9-



26-05 by Ord. No. 05-28]

D. The  fee  for  a  demolition  permit  shall  be  One  Hundred  Fifty  Dollars  ($150.00)  for  a  one  or

two-family residence (Use Group R-5 of the Building Subcode) and Two Hundred Fifty Dollars

($250.00)  for all other use groups.  Tank demolition permit shall be under Eleven Hundred

Gallons (1100) One Hundred Dollars ($100.00).  Over Eleven Hundred gallons (1100+) Two 

Hundred Dollars ($200.00).  [Amended 4-11-94 by Ord. No. 94-20; 9-26-05 by Ord. No. 05-28;

6-25-07 by Ord. No. 07-20]

E.

The  fee  for  a  permit  for  removal  of  one  (1)  building  from  one  lot  to  another  or  to  another



location  on  the  same  lot  shall  be  in  the  amount  of  Twenty  Five  dollars  ($25.00)  per  one

thousand dollars ($1,000.) of the estimated cost of moving the buildings, estimated cost of new

foundations and all work necessary to place the building in its completed condition in the new

location, provided that the minimum fee shall be One Hundred Dollars ($100.00).  [Amended

4-11-94 by Ord. No. 94-20; 6-25-07 by Ord. No. 07-20]

F.

The fee for plan review shall be twenty  percent  (20%) of the amount to be charged for the



construction permit and shall be paid before the plans are reviewed.  The amount paid for this

fee shall be credited toward the amount of the fee to be charged for the construction permit.

7509

 9-07


& 75-3

EAST BRUNSWICK CODE

& 75-3

G. The  fee  for  a  permit  to  construct  a  sign  shall  be  One Dollar  and fifty  cents  ($1.50) per

square foot of the surface area of the sign, provided that the minimum fee shall be Sixty

Five Dollars ($65.00).  In the case of double-faced signs, the area of the surface of only

one (1) side of the sign shall be used for purposes of the fee computation.  [Amended 4-

11-94 by Ord. No. 94-20; 9-26-05 by Ord. No. 05-28; 6-25-07 by Ord. No. 07-20]

H. Certificate of occupancy.  [Amended 1-6-92 by Ord. No. 91-85;  amended 4-11-94 by Ord.

No. 94-20; 9-26-05 by Ord. No. 05-28; 6-25-07 by Ord. No. 07-20]

(1) A  fee  for  a  Certificate  of  Occupancy  shall  be  required  for  all  new  construction,

additions, alterations or renovations, in the amount not less than ten percent (10%)

of the permit fee.

A Certificate of Occupancy fee for all new commercial buildings or additions shall be

Ten  percent  (10%)  of  the  permit  fee  with  a  minimum  fee  of  One  Hundred  Dollars

($100.00).

A Certificate of Occupancy fee for commercial renovation, repair or alteration shall be

Ten  percent  (10%)  of  the  permit  fee  with  a  minimum  of  One  Hundred  Dollars

($100.00).

Spec. Buildings, Malls & Similar Structures - Certificate of Occupancy for each tenant

shall be One Hundred Dollars ($100.00).

The Certificate of Occupancy fee for all new residential buildings or additions shall be

Ten  percent  (10%)  of  the  permit  fee  with  a  minimum  fee  of  One  Hundred  Dollars

($100.00).  [Amended 4-11-94 by Ord. No. 94-20; 9-26-05 by Ord. No. 05-28]

The Certificate of Occupancy fee for residential renovation or alteration shall be Ten

percent  (10%)  of  the  permit  fee  with  a  minimum  fee  of  Fifty  Dollars  ($50.00).

[Amended 9-26-05 by Ord. No. 05-28]

The Certificate of Occupancy fee for residential additions, renovations or alterations

shall be payable at the time the permit is issued.

Inspection fee for minimum health and safety requirements for existing building shall

be Fifty Dollars ($50.00) Residential R-5 and One Hundred Dollars ($100.00) for other

use groups.   [Amended 9-26-05 by Ord. No. 05-28]

The fee for each reinspection of existing buildings shall be Fifty Dollars ($50.00).

(2) The  fee  for  a  certificate  of  continued  occupancy  shall  be  Fifty  Dollars  ($50.00)  for

Residential R-5 and Two Hundred Dollars ($200.00) other use groups. [Amended 9-

26-05 by Ord. No. 05-28; 6-25-07 by Ord. No. 07-20

(a)

A Certificate of Continued Occupancy shall be required for a change of owner



or tenant in all use groups except Residential R-5.   [Added 9-26-05 by Ord.

No. 05-28]

(3) The fee for a certificate of occupancy granted pursuant to change of use shall be Two

Hundred Dollars ($200.00).   [Amended 9-26-05 by Ord. No. 05-28; 6-25-07 by Ord.

No. 07-20]

7510


 9-07

& 75-3

CONSTRUCTION CODES, UNIFORM

& 75-3

(4) An  Application  Processing  Fee  shall  be  collected  and  shall  be  non  refundable  when  a

Construction Permit is submitted for review [Added 6-25-07 by Ord. No. 07-20]

Residential R-5 One and Tw o Fam ily Homes

R-5 Residential - Alteration/Renovation $50.00

R-5 Residential - Addition $100.00

R-5 Residential - New House $300.00



All Other Use Groups:

Alteration/Renovation $150.00

Addition $250.00

CCO Application $50.00

New Building $1,000.00

(5) A Non Refundable Prior Approval Review Fee Shall  Be  Collected with all Construction

Permit Applications submitted for review [Added 6-25-07 by Ord. No. 07-20]:

R-5 Residential One and Tw o Fam ily Homes

R-5 Residential Addition, Alteration or Renovation $25.00

R-5 New Home $100.00

All Other Use Groups

CCO Application $25.00

Alteration/Renovation $200.00

Addition $300.00

New Building $500.00

I.

Elevator/Escalator Fees:  [Amended 8-24-92 by Ord. No. 92-31; 6-25-07 by Ord. No. 07-20]



(a) The Department Fees for witnessing acceptance tests and performing inspections shall

be as follows:

1.

The basic fees for elevator devices in strictures not in Use Group R-3 or R-4 shall be



as follows [Amended 6-25-07 by Ord. No. 07-20]:

a.

Traction and winding drum elevators:



(1)  One to 10 floors

$ 300.00


(2)  Over 10 floors

$ 450.00


b.

Hydraulic elevators

$ 275.00

c.

Roped hydraulic elevators



$ 300.00

d.

Escalators, moving walks



$ 275.00

e.

Dumbwaiters



$ 125.00

f.

Stairway chairlifts, inclined and



vertical wheelchair lifts and manlifts

$  125.00

2.

Additional charges for devices equipped with the following features shall be as follows



[Amended 6-25-07 by Ord. No. 07-20]:

a.

Oil buffers (charge per oil buffer)



$   65.00

b.

Counterweight governor and safeties 



$ 150.00

c.

Auxiliary power generator



$  100.00

7511


   9-07

& 75-3

EAST BRUNSWICK CODE

& 75-3

3.

The Department fee for elevator devices in structures in Use Group R-3 or R-4 shall



be  $150.00.    This  fee  shall  be  waived  when  signed  statements  and  supporting

inspection  and  acceptance  test  reports  are  filed by  an  approved  qualified  agent  or

agency in accordance with N.J.A.C. 5:23-2.19 and 2.20.

4.

The fee for witnessing acceptance tests of, and performing inspections of, alterations



shall be $150.00. [Amended 6-25-07 by Ord. No. 07-20]

(b)


The Department fees for routine and periodic tests and inspections for elevator devices

in structures not in Use Group R-3 or R-4 shall be as follows [Amended 6-25-07 by Ord.

No. 07-20]:

1.

The fee for the six month routine inspection of elevator devices shall be as follows



[Amended 6-25-07 by Ord. No. 07-20]:

a.

Traction and winding drum elevators:



(1)  One to 10 floors

$ 175.00


(2)  Over 10 floors

$ 300.00


b.

Hydraulic elevators

$ 150.00

c.

Roped hydraulic elevators



$ 175.00

d.

Escalators, moving walks



$ 175.00

2.

The fee for the one year period inspection and witnessing of tests of elevator devices,



which shall include a six month routine inspection, shall be [Amended 6-25-07 by Ord.

No. 07-20]:

a.

Traction and winding drum elevators:



(1)  One to 10 floors

$ 250.00


(2)  Over 10 floors

$ 300.00


b.

Hydraulic elevators

$ 200.00

c.

Roped hydraulic elevators



$ 250.00

d.

Escalators, moving walks



$ 350.00

e.

Dumbwaiters



$ 110.00

f.

Manlifts, stairway chairlifts, inclined



 and vertical wheelchair lifts

$ 150.00


3.

Additional yearly periodic inspection charges for elevator devices equipped with the

following features shall be as follows [Amended 6-25-07 by Ord. No. 07-20]:

a.

Oil buffers  (charge for oil buffer)



$   65.00

b.

Counterweight governor and safeties



$ 100.00

c.

Auxiliary power generator



$   75.00

4.

The  fee  for  the  three  year  or  five  year  inspection  of  elevator  devices  shall  be  as



follows [Amended 6-25-07 by Ord. No. 07-20]:

a.

Traction and winding drum elevators:



(1)  One to 10 floors  (five year insp.)

$ 450.00


(2)  Over 10 floors  (five year insp.)

$ 475.00


b.

Hydraulic and roped hydraulic elevators:

(1)  Three year inspection

$ 300.00


(2)  Five year inspection

$ 200.00


7512

    9-07


& 75-3

CONSTRUCTION CODES, UNIFORM

& 75-3

(c)


When the Department is the enforcing agency, the fees set forth in (b) above shall be

paid  annually  in  accordance  with  the  following  schedule,  which  is  based  on  the

average of the fees to be collected over a five year period [Amended 6-25-07 by Ord.

No. 07-20]:

1.

Basic annual fee as follows:



a. Traction and winding drum elevators:

(1)  One to 10 floors

$ 450.00

(2)  Over ten floors

$ 500.00

b. Hydraulic elevators

$ 300.00

c. Roped hydraulic elevators

$ 325.00

d. Escalators, moving walks

$ 500.00

e. Dumbwaiters

$ 100.00

f.

Stairway chairlifts, inclined and



 

vertical wheelchair lifts, manlifts

$ 150.00

2.

Additional charges for devices equipped with the following features as follows [Amended



6-25-07 by Ord. No. 07-20]:

a.

Oil buffers  (charge per oil buffer)



$   65.00

b.

Counterweight governor and safeties



$  100.00

c.

Auxiliary power generator



$   75.00

J.

FIRE SUBCODE FEES as follows:  [Amended 8-24-92 by Ord. No. 92-31;  amended 4-11-94



by Ord. No. 94-20; 9-26-05 by Ord. No. 05-28; 6-25-07 by Ord. No. 07-20]

1.

Fees for Sprinklers  [Amended 9-26-05 by Ord. No. 05-28; 6-25-07 by Ord. No. 07-20]



1 - 20 Heads

$ 125.00 

  

Over 100 Heads



$ 200.00  

$2.00 per each padded head 

+ Additional fee for each sprinkler riser

$ 100.00 

 

[Amended 6-25-07 by Ord. No. 07-20]



+ Each Standpipe riser

$ 230.00


+ Hydraulically designed systems calculations @ 

$   75.00  

+ Fire Pumps

$ 300.00


[Amended 6-25-07 by Ord. No. 07-20]

+ Water storage tanks for Fire Protection 

systems            

$ 400.00


+ Fire Flow Test for Design 1  Hydrant

$   75.00

st

   each additional Hydrant test for same



   site

$   25.00

+ Site Fire Protection Underground

   and Mains  

$ 200.00

7513


 9-07

& 75-3

EAST BRUNSWICK CODE

& 75-3

2.

Range hood extinguishing systems [Amended 9-26-05 by Ord. No. 05-28; 6-25-07 by Ord.



No. 07-20]

Wet Chemical

$125.00

Dry Chemical



  

$ 125.00


Co2 Suppression

$ 125.00


3.

Kitchen & Hazardous Hood Exhaust System

[Amended 9-26-05 by Ord. No. 05-28; 6-25-

07 by Ord. No. 07-20]

Type 1

$ 150.00


Type 2

$ 100.00


Residential Kitchen exhaust hood  

$   35.00

4.

Foam Fire Suppression Systems



$ 150.00

[Amended 4-11-94 by Ord. No. 94-20]

5.

Pre-Engineered Fire Suppression Systems 



$ 125.00

[Amended 9-26-05 by Ord. No. 05-28; 6-25-07

by Ord. No. 07-20]

6.

Heating Devices  (HVAC) 



[Amended 9-26-05 by Ord. No. 05-28; 

6-25-07 by Ord. No. 07-20]

Residential Heating Units New

$   65.00 per unit

Replacement R-5 unit of same fuel type

$   35.00 per unit

Commercial Heating Units

$ 100.00 per unit

7.

Fireplace review



$   50.00

[Amended 9-26-05 by Ord. No. 05-28; 

6-25-07 by Ord. No. 07-20]

8.

Automatic Fire Alarm Systems



 $ 150.00 or $100.00 

[Amended 9-26-05 by Ord. No. 05-28;

 per 10,000 sq. ft.

6-25-07 by Ord. No. 07-20]

Central Station Alarms

$   75.00

Manual Fire Alarm Systems

$   75.00 for 1  Device & $15.00

st

each Additional



Duct Smoke Detector

$   65.00

Residential Smoke Detectors

$   65.00

Commercial Smoke Detectors

$   75.00

Flame or Beam Smoke Detectors

$   75.00

Security Locks to Fire system

$      75.00  for 2 locks and $15.00

each additional

9.

Smoke Removal Systems



$ 400.00

[Amended 9-26-05 by Ord. No. 05-28; 

6-25-07 by Ord. No. 07-20]

Elevator Recall

$ 150.00

Emergency Light & Exit Lights

$   35.00 each 5 units

Emergency & Voice Comm. Systems

$ 250.00

Generator Systems

$ 100.00

7514


 9-07

& 75-3

CONSTRUCTION CODES, UNIFORM

& 75-3.1

10. Tank Installation - All above ground and below ground  [Amended 4-11-94 by Ord. No. 

94-20; 9-26-05 by Ord. No. 05-28; 6-25-07 by Ord. No. 07-20]

0 - 600 Gallons

$ 100.00

601 - 1100 Gallons

$ 200.00

1101 - 2000 Gallons

$ 250.00

Over 2001 Gallons

$ 400.00

11. The Minimum fire subcode fee shall be Twenty Five Dollars ($25.00) per $1,000.00 of the

Job Cost with a minimum of Fifty Dollars ($50.00).  [Amended 4-11-94 by Ord. No. 94-20;

9-26-05 by Ord. No. 05-28; 6-25-07 by Ord. No. 07-20]

12. Incinerator and crematorium

   $ 365.00

[Added 4-11-94 by Ord. No. 94-20]

13. Change of Contractor after a permit is issued.

$   20.00

[Added 9-26-05 by Ord. No. 05-28]

K.

The Construction Official shall, with the advice of the subcode officials, prepare and submit to



the East Brunswick Township Council, annually, a report recommending a fee schedule based

on  the operating expenses of the agency and any other expenses of the municipality  fairly

attributable to the enforcement of the State Uniform Construction Code Act.

3

L.



In order to provide for the training, certification and technical support programs required by the

Uniform Construction  Code Act and the regulations,   the enforcing agency shall collect, in

4

addition to the fees specified above, a surcharge fee of $0.00265 per cubic foot of volume of



new construction, new buildings, and additions.  Volume shall be computed in accordance with

N.J.A.C.5:23-2.28.   The  fee  for  all  other  construction  shall  be  $1.35  per  $1,000  of  value  of

construction.      Said  surcharge  fee  shall  be  remitted  to  the  Bureau  of  Housing  Inspection,

Department  of  Community  Affairs,  on  a  quarterly  basis  for  the  fiscal  quarters  ending

September 30, December 31, March 31 and June 30, and not later than one (1) month next

succeeding the end of the quarter for which it is due.  In the fiscal year in which the regulations

first become effective, said fee shall be collected and remitted for the third and fourth quarters

only. [Amended 9-26-05 by Ord. No. 05-28]

M. The enforcing agency shall report, annually, at the end of each fiscal year to the Bureau of

Housing Inspection, and not later than July 31, the total amount of the surcharge fees collected

in the fiscal year.  In the fiscal year in which the regulations first become effective, said report

shall be for the third and fourth quarters only.



& 75-3.1.

Chief Construction Official; fire-damaged or other structurally unsafe

buildings.

The East Brunswick Chief Construction Official is hereby designated as the municipal officer who

shall take remedial action with regard to buildings or structures which are unfit for human habitation,

occupancy or use. [Added 10-12-81 by Ord. No. 81-408]

7515

    9-07


        Editor's Note:  N.J.R.S. 52:27D-119 et seq.

3

  Editor's Note:  "The regulations" refers to the regulations established by the Commissioner of the



4

Department of Community Affairs.



& 75-3.2

EAST BRUNSWICK CODE

& 75-4

& 75-3.2.

Statement  of  Intent  to  be  filed  with  Director  of  the  Department of

Planning  and  Engineering.  [Added  1-31-83  by  Ord.  No.  83-488;

amended 9-26-05 by Ord. No. 05-28; 3-9-09 by Ord. No. 09-06]

On all applications for construction permits, change of use, tenant or owner, the applicant shall file

a detailed statement with the Director of the Department of Planning and Engineering and apply to the

Construction Official for a Continuing Certificate of Occupancy except R-5 Residential use group setting

forth the existing use of the land and buildings which are the subject of the application and the proposed

use of the land and buildings including, but not limited to, the following [Amended 9-26-05 by Ord. No.

05-28]:

(a)


Number and type of employees;

(b)


Present and proposed activity on the premises;

(c)


Present and proposed customers or clientele, whether retail or wholesale;

(c.1)


Drawing or Sketch of Layout and Floor Plan of existing Structure(s)

[Added 9-26-05 by Ord. No. 05-28; amended 3-9-09 by Ord. No. 09-06]

(d)

Such  other  information  which  may  reasonably  be  required  by  the  Director  of  the



Department of Planning and Engineering to determine whether or not a change of use is

proposed which would necessitate an application for site plan approval.  [Amended 9-26-

05 by Ord. No. 05-28]

& 75-3.3.

Request for Information.  [Added 5-22-89 by Ord. No. 89-30; Amended 

1-27-03 by Ord. No. 03-01]

This section is hereby repealed by the enactm ent of the New  Jersey Open Public Records Act

(N.J.S.A. 47:1A-1 et seq)

& 75-4.

Repealer.

All ordinances or parts of ordinances inconsistent with or in conflict with this chapter are hereby

repealed to the extent of such inconsistency, including but not limited to Section 2-6.5e, Construction

Board of Appeals; Chapter XIV, Plumbing; and Sections 16-1 through 16-6, inclusive, of the Building

Code.   Section 16-7, Building Contractor Registration and Security,  is specially saved from repeal.

5

6



7516

-09


        Editor's Note:  Section 2-6.5e of the Revised General Ordinances formerly created a Construction

5

Board of Appeals within the Division of Code Management Services within the Department of Administrative



Services.  Chapter SIV of the Revised General Ordinances was adopted 6-13-66 as Ord. No. 66-54 and

amended 7-25-66 by Ord. No. 66-54-A; 8-12-68 by Ord. No. 68-54B; 9-23-68 by Ord. No. 68-118; 12-9-68

by Ord. No. 68-54C; 4-14-69 by Ord. No. 69-134; 5-26-69 by Ord. No. 69-54-D.  Sections 16-1 through 16-6

of the Revised General Ordinances were adopted 10-22-63 and amended 7-15-66 by Ord. No. 66-61; 9-23-

68 by Ord. No. 68-118; 11-13-68 by Ord. No. 68-61-B; 5-14-73 by Ord. No. 73-61-G; 9-9-74 by Ord. No. 74-

61-I; 10-29-74 by Ord. No. 74-135-K; 11-11-74 by Ord. No.  74-61-J; 10-6-75 by Ord. No. 75-134-C.

        Editor's Note:  See Ch. 78, Contractors, Building.

6


Download 8.87 Mb.

Do'stlaringiz bilan baham:
1   ...   17   18   19   20   21   22   23   24   ...   115




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling