The Township of East Brunswick was established in 1860. Since January 1, 1965, the


Download 8.87 Mb.
Pdf ko'rish
bet95/115
Sana05.08.2017
Hajmi8.87 Mb.
#12784
1   ...   91   92   93   94   95   96   97   98   ...   115

C.

DISCONTINUANCE OF SERVICE

Service  may,  at  the  sole  discretion  of  the  Utility,  be  discontinued  for  any  of  the

following reasons:

1.

Misrepresentation in application



21931

  10-10


& 219-9

EAST BRUNSWICK CODE

& 219-9

2.

W illful  waste  of  water  through  improper  or  imperfect  pipes,  fixtures,  or



otherwise.

3.

Use of sewer for any other property or purpose than that described in the



application.

4.

Tampering with any service pipe, or any other appliance of the Utility.



5.

Nonpayment of any charge accruing under the application.

6.

Refusal  of  reasonable  access  to  the  property  for  purposes  of  inspecting,



reading, repairing, or removing meters and/or plumbing.

7.

Making, or refusing to sever any cross connection between a pipe or fixture



furnished by the Utility and a pipe or fixture from any other source.

8.

Nonpayment of bills within time prescribed.



9.

Violation of any rules of the Utility.



D.

RENEW AL OF SERVICE

Service  will  be  renewed  when  the  conditions  under  which  such  service  was

disconnected are corrected and upon payment of all accrued charges provided in the



schedule of rates or rules of the Utility.

E.

DEPOSITS


Deposits may be required from new customers without a record of prior use, or from

any customer who becomes habitually delinquent.  The amount of the deposit shall

be equal to the average or estimated bill.

Any customer having paid a deposit shall pay bills for sewer service as rendered, in

accordance with the Rates, Rules and Regulations of the Utility.  The deposit shall

not be considered as payment on account of a bill during the time the custom er is

receiving service.

Deposits shall be returned to the depositor when he shall have paid undisputed bills

for service for a period of twelve (12) consecutive months.

No interest will be paid on deposits.



F.

CONTINUING OBLIGATION TO PAY SERVICE CHARGE

Upon the connection to a sewer for an improved and usable property, the obligation

to pay the minimal annual service charge continues despite the failure to occupy the

property  or  to  use  the  sewer  facilities,  so  long  as  the  building  or  structure  on  the

property is still available for use and the sewer facilities remain available.

W ithout written notice, it shall be assumed that connections are or may be active,

thereby requiring sewer service.  Charges will therefore continue until written notice

of discontinuance.

21932


 10-10

& 219-9

SEWER UTILITY

& 219-10

G.

FORM OF PAYMENT

Form of payment may be by check or U.S. currency.  The Utility reserves the right

to refuse payment rendered in significant amounts of coin.  For any property on tax

title lien, or any account where a check was returned by the bank, payment must be

in certified check, money order, or U.S. currency.



H.

DISCONNECTION OF SEW ERAGE FACILITIES

In the event that a sewer lateral service will be permanently discontinued, the Utility

shall be notified in writing that the service billing will be terminated.  The property

owner must file a letter for disconnection of sewerage facilities, and the sewer lateral

shall be permanently sealed water tight by the property owner in a manner subject

to the approval of the Inspector, with all costs of review and field observation being

borne by the property owner.



& 219-10.

Responsibility For Service

A.

REASONABLE ACCESS



The properly identified authorized agents of the Utility shall have the right of access

to the premises served, at all reasonable hours, for the purpose of reading meters,

collecting samples, examining fixtures and pipes, observing the manner of use, and

for any other purpose which is proper and necessary in the conduct of the Utility’s

business

B.

NO ORAL AGREEMENTS

No agent or employee of the Utility has authorization to orally bind it by any promise,

agreement, or representation not provided for in these Rates, Rules and Regulations.



C.

DAMAGE AND REPAIRS

W henever any person(s), firm(s), partnership(s), corporation(s), or any combination

thereof causes or has caused any damage to the sewer system or facilities of the

Utility, the party or parties causing such damage shall immediately notify the Utility

of such damage.  The Utility shall have the right to repair such damage or have such

damage repaired, and shall have the further right to recover the full cost and expense

of such repairs, including but not limited to the standard charges for work performed

by Utility employees, for materials, supplies and equipment used for such repairs,

from the party or parties causing such damage.



D.

MANDATORY SEW ER CONNECTION

The owner of any house, building or structure located on a street along the line of

any sewer which is now in operation or is constructed in the future in the Township

of East Brunswick shall connect the drainage of all sources of sewage in the house,

building or structure to the sewer.  Any owner of a building or structure who fails to

connect to a sewer system after written notification by the Utility of the availability of

service,  shall  be  subject  to  the  penalties  and  remedies  of  the  East  Brunswick

Township Ordinance.

21933


  10-10

& 219-11

EAST BRUNSWICK CODE

& 219-11

& 219-11.

Fees and Charges

A.

FEES AND DEPOSIT TO ACCOMPANY APPLICATION AND PERMITS

For  standard  applications,  see  table  below  for  fees.    Minimum  deposits  may  be

increased if the Utility review exceed these minimum requirements

APPLICATION

FILING


FEE

DEPOSIT FOR REVIEW

DEPOSIT FOR

INSPECTION

Conceptual Review of

Sewerage Facilities

$100

$50 per connection unit,



Min. deposit is $1,000

None


Renewal Authorization

$50


$50 per connection unit,

Min. deposit is $1,000***

None

Pumping Station Review



$100

$2,500 per pump, station,

minimum deposit

None


Construction Authorization

$200


$1.50 per ft of sewer plus

$500 per pumping

station.  Min. deposit is

$1,000***

10% of approved

construction cost 

Min. deposit $1,000

Renewal Authorization

$50

$1.00 per ft of sewer plus



$500 per pumping station

Min. Deposit $1,000***

10% of approved

construction cost

Min. deposit $1,000

Performance Bond

Reduction/Release

$100


$0.50 per ft of sewer plus

$500 per pumping station

Min. deposit $1,000, plus

pumping station deposit if

applicable (re-application

deposit as required)

5%  of approved

construction cost 

Min. deposit $1,000 

(Re-application

deposit as required)

Special Review

None

Minimum Deposit - $500



Minimum for connection of

Residential Sanitary

Sewer

$25*


None

Actual Cost**

Minimum for connection of

Commercial Sanitary

Sewer

$50*


Actual Cost**

Actual Cost**

Industrial Sewer

Connection Application

and Industrial W aste

Discharge Agreement

(Fees additional to Forms

A through D)

$50

Actual Cost **



Min. deposit $4500

Actual Cost**

21934

 10-10


& 219-11

SEWER UTILITY

& 219-11

Change of Use

None

None (unless special



review or analysis

required)

Actual Cost**

Disconnection of

Sewerage Facilities

None


None

Actual Cost**

Initial Floor Drain

Application

$25*

Actual Cost**



Min. $100 deposit for

floor drain review, plus

any special costs of

review because of

unusual wastes, industrial

processes or special

circumstances

Actual Cost**

Annual Renewal/

Floor Drain Permit

$25

Actual Cost**



Swimming Pool

Drainage Application

$25

Actual Cost**



Minimum deposit $100

Actual Cost

Swimming Pool

Drainage Permit:

10,000 - 20,000/gal

Over 20,000/gal

$25*

$100*


Annual

Renewal/Swimming Pool

Drainage Permit:

10,000 - 20,000/gal

Over 20,000/gal

$25


$100

*(not including connection fees)

**(Actual Cost of EBSU - Time, Equipment and Materials overhead roll up taxes, if applicable)

***May be adjusted if re-application is unchanged from initial application



B. SEW ER SERVICES CHARGES

All owners of property connected to the sewer system of the East Brunswick Sewer Utility shall pay

to the Utility a base sewer service charge in accordance with the following schedule:

The sewer service charge shall be at the annual rate of $280.00 for each Service Unit.

The classification of establishments connected to the sewer system and the Service Units chargeable

to each such establishment shall be as follows:

1.

Residential Establishments:



a)

Each single family residence - One service unit

b)

House trailer shall be one service unit



21935

  10-10


& 219-11

EAST BRUNSWICK CODE

& 219-11

c)

Each  apartment  in  a  m ulti-family  dwelling,  apartment  house,



commercial or other building, shall be one service unit.

2.

For  all  other  buildings  or  establishments,  including  com m ercial



establishments,  industrial  establishments  (with  only  domestic  sewage),

schools and public buildings, the charge shall be the greater of:

a)

0.1 service units per 10,000 gallons of sewage flow or part thereof;



or

b)

The  number  of  service  units  as  specified  for  the  particular



classification in & 219-11(O) hereof, multiplied by the annual rate

set forth herein.



The volume of sewage flow on which the determination of the unit charges

applicable under (a) above are based shall, except as otherwise provided

for herein, be assumed to be the same as the quarterly volume of water use

as determined by the East Brunswick W ater Utility.  Volume of water use

does not apply and shall have no impact on rates charges by service unit

classification under (b)

3.

W ater  used  but  not  discharged  into  sanitary  sewers  by  Commercial  and



Industrial Establishments.

W henever any commercial or industrial establishment uses water in such

manner that water used is not discharged into the sanitary sewer system of

the  East  Brunswick  Sewer  Utility,  the  quantity  of  water  so  used  and  not

discharged  into  the  sanitary  sewerage  system  shall  be  excluded  in

determining the sewer charges for said premises; providing, however, that

the quantity of water so used and not discharged into the sewerage system

is  m easured  by  a  device  or  meter  approved  by  the  Superintendent  and

installed by the owner of the premises without cost to the Utility.  In lieu of

the installation of a device or meter for measuring the quantity of water not

discharged  into  the  Utility’s  sanitary  sewerage  system,  the  owner  of  the

premises may install, at his own cost and expense, a device or meter  for

measuring the quantity of sewage discharged into the Utility’s sanitary sewer

system.


W hen,  in  the  opinion  of  the  Superintendent,  it  is  not  practical  to  install  a

measuring  device  to  continuously  determine  the  quantity  of  water

discharged into  or not discharged into the sanitary sewerage system, the

Utility  shall  determ ine,  in  such  manner  or  by  such  method  as  it  may

prescribe,  the  quantity  of  water  discharged  into  the  sanitary  sewerage

system, either as a percentage of the total volume of metered water use or

otherwise.  Any dispute as to the estimated amount shall be determined by

the Utility and its decision shall be final.   If the owner of the property is not

willing to accept the determination of the Utility he may be required, for the

purpose of determining future sewer rental charge, to install an approved

measuring device as described in the paragraph above.

21936


 10-10

& 219-11

SEWER UTILITY

& 219-11

4.

Sewer Charges to Commercial or Industrial Establishment without separate



water meters

W henever two or more establishments are served by a single water meter

the Utility may estimate the amount of water delivered to each establishment

and  may  apply  full  or  minimum  charges  to  each  establishment  as

enumerated above.

If the owner of the property does not agree to the Utility’s determination of

the sewer charge as set forth above, he shall, at his sole cost and expense,

install separate meters for each building or establishment on the premises.



5.

Floor Drain Charges

1.

Floor Drains - 0.30 service units per 1,000 sq. ft. (or part) of building



are tributary to floor drains.

2.

Vehicle  Bays  -  Additional  0.33  service  units  per  bay  where



occasional car washing may be expected

Additional  0.66  service  units  per  bay  where  occasional  truck

washing (exterior or interior) may be expected.

6.

Swimming Pool Drains



A.

For swimming pool sizes as follows:

1.

10,000 - 20,000 gallons, additional .20 service units



2.

20,000 - 40,000 gallons, additional .80 service units

3.

Over 40,000 gallons, additional .20 service units per 10,000



gallons or part thereof

C.

CONNECTION CHARGES

A  connection  charge  or  charges  shall  be  imposed  for  each  direct  or  indirect

connection to the East Brunswick Sewer System.  The charges shall be as per this

Rate  Schedule  for  each  Service  Unit  as  defined  in  &  219-11(O )  under  Initial

Connection Charge, except where otherwise noted.

Initial  charges  for  the  right  to  connect  directly  or  indirectly  to  the  Utility’s  sewer

system shall include a connection fee per unit, as unit is herein defined under “Initial

connection Charge”, as well as additions to fees and charges for inspections of the

work  to  be  accomplished  by  applicants  in  keeping  with  the  Utility’s  Rules  and

Regulations as the same are promulgated, amended, modified and supplemented

from time to time.  Such Connection Fees, which are and constitute a one time initial

charge for the right to connect to the Utility’s sewer system, are an integral part of the

Utility’s Rate Schedule and are a distinct and separate charge from all other rates

and sewer charges and payment of one shall not constitute payment of the other.

21937


  10-10

& 219-11

EAST BRUNSWICK CODE

& 219-11

Connection Charge - The connection charge shall be a fee charged to any customer

of the East Brunswick Sewer Utility at the time of connection of the facility or facilities

of  said  customer  either  directly  or  indirectly  to  any  portion  of  the  East  Brunswick

Sewer  Utility  system ,  or  at  the  time  when  sewer  service  becomes  available,

calculated  on  the  basis  of  capital  costs  expended  by  the  Utility  to  the  date  of

calculation together with accrued interest thereon.

The connection charge shall be updated from time to time by the East Brunswick

Sewer Utility to reflect additional capital costs and additional interest accrued on the

East Brunswick Sewer Utility sewer system.



The current connection charge is $2,264.00 per Service Unit.

Upon an addition, alteration or change in use of any building already connected to

the  Utility  system ,  an  additional  connection  fee  may  be  charged  based  upon  the

sewer connection designations.



D.

W ASTE SURCHARGES

W aste volum es shall be based on a metered flow, corroborated (when requested)

by water meter records.  Charges for volume shall be as shown in the rate schedule.

W aste strength shall not exceed the limits listed in the section entitled Industrial or

Commercial Service without pretreatment.  Where samples indicate that strengths

exceed  those  of  a  domestically  equivalent  waste*,  and if  such  wastes  have  been

introduced  into  the  Utility  sanitary  sewer  system,  surcharges  will  be  imposed  as

follows:

1.

The surcharges for suspended solids, biochemical oxygen demand, chlorine



demand, and other materials shall be those actual charges to the Utility by

the MCUA, as the same may be revised from time to time, plus 25%  to cover

the Utility’s costs of administration and for the impact of those excess waste

strengths  on  the  Utility’s  sewer  system,  plus  any  and  all  testing  costs

associated with determining the excesses of parameter limits.

2.

The  surcharges  for  grease,  oil,  fats,  either  vegetable  or  m ineral,  shall  be



$.50 per pound for the concentrations in excess of the allowable limit of 100

mg/L.


3.

W here any samples taken be EBSU or by the customer shows an excess of

suspended solids and BOD is excess of 225 mg/L, grease and oil in excess

of  100  mg/L,  and  chlorine  demand  in  excess  of  10  mg/L,  then  such

surcharges  as  may  be  developed  shall  be  applicable  to  a  full  or  partial

quarter assessment against the tested customer.

Notwithstanding the above-referenced provisions, the Utility hereby establishes an

average  surcharge  limitation  program  for  surcharge  billing  for  any  parameter

limitation  listed  in  the  East  Brunswick  Sewer  Utility  Rules  and  Regulations. 

Acceptance into the program is limited to those customers who: 

Have a minimum history of at least two years of surcharge testing data available, and

Eligibility  for  continued  acceptance  in  the  surcharge  limitation  program  shall  be

conditioned upon the customer meeting the following conditions:

21938


 10-10

& 219-11

SEWER UTILITY

& 219-11

The customer shall pay all surcharge billings from the Utility within thirty (30) days

of receipt of such billing.  The failure to pay such surcharge billings within the thirty

day period will result in an automatic cancellation of the customer’s participation in

the average surcharge program.

As a condition for acceptance into the surcharge program, a customer agrees to the

following:


a.

The Utility will utilize, at a minimum, six (6) months surcharge testing data

to establish the average limitation for each parameter.

b.

The Utility will thereafter use the quarterly surcharge test results to modify



the  customer’s  average  limitation  for  each  parameter.    However,  results

which vary with the customer’s established average for any parameter by

fifty percent (50% ) or more will be discarded unless subsequent test results

substantiate the higher test results.

c.

Any modification to average limitations will result in the recalculation of the



customer’s current surcharge billing.

The  Collector  of  Revenue  shall  have  the  discretion  to  make  any  modifications

necessary to insure that the intent of the average surcharge limitation program as

approved by the EBSU is adhered to.

*For sewer service charges, domestically equivalent sewage shall have a BOD5 and

suspended solids limit of 225 mg/L or  less,  and a chlorine demand of 10 mg/L or

less.  Surcharges will be based on the excesses of BOD5, suspended solids  and

chlorine demand over the limits as noted above.



E.

PAYMENTS OF CONNECTION FEE

For  single  family  home,  existing  prior  to  the  installation  of  collection  lines  by  the

Utility,  and  applying  and  connecting  within  thirty  (30)  days  after  notification  of

availability of services by the Utility, payment must be:

1.

In lump sum, or



2.

In three (3) equal installments over a three year period, commencing at time

of availability of service, prior to connection.  (Balance to be paid in full upon

change in ownership)

Single family home built after collection lines were installed, payment must be:

1.

In lump sum prior to connection or occupancy.



Property owners who fail to make application and connection within the required time

limits,  and  do  not  have  written  certification  from  the  Township  of  East  Brunswick

indicating valid reasons for not connecting:

1.

Payments  due  in  full  on  date  service  becomes  available.    Service  is



considered available upon notification by the Utility, which is not necessarily

the time of connection.

21939

  10-10


& 219-11

EAST BRUNSWICK CODE

& 219-11

For developments comprising two (2) or more homes, payment must be made:

1.

Prior to submission of Application for Acceptance; or



2.

Phased in accordance with construction phases if so approved by the Utility.



W here multi-family or non-residential structures exist prior to the installation of the

collection system, payment must be made:

1.

In full within thirty (30) days after the notification that service is available.



2.

Prior to the connection if the connection is made within the thirty (30) day

limit.

W hen multi-family or non-residential structures are built after the collection system



is available for service, payment must be made:

1.

At  the  time  of  the  application,  which  must  be  prior  to  the  connection  and



occupancy.

A  change  in  use  shall  require  the  submission  of    Change  of  Use  form,  and  may

require  the  payment  of  an  additional  connection  fee,  if  the  connection  fee  for  the

resulting use is higher than the connection fee for the prior use at the time of change

in use.  The amount of the connection fee will be the connection fee for the resulting

use, less the connection fee paid for the prior use of the property.



Download 8.87 Mb.

Do'stlaringiz bilan baham:
1   ...   91   92   93   94   95   96   97   98   ...   115




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling