Dzhankeldy 500MW Wind Farm 
ESIA Volume 2- Main Text, Tables & Figures 
20 
P
ASTURE 
D
EVELOPMENT 
A
SSOCIATION
 
Mr. Erkin Khaitov 
– Head of Pasture Development 
Association
2
B
UKHARA REGIONAL BRANCH OF THE 
C
OMMITTEE FOR THE 
D
EVELOPMENT OF 
S
ERICULTURE AND 
W
OOL 
I
NDUSTRY OF THE 
R
EPUBLIC OF 
U
ZBEKISTAN
 
Mr. Nemat Mamarizaev 
– Head of the Bukhara regional 
branch of the Committee for the Development of 
Sericulture and Wool Industry of the Republic of 
Uzbekistan 
R
EPRESENTATIVE OF 
D
ZHANKELDY 
LLC 
Mr. Nishon Dzhalmurzaev
– Director of LLC 
ACWA
 
P
OWER
 
Mr. Sherzod Onarkulov 
– Senior Manager 
Mr. Akbar Mavlonov 
– BD Manager 
J
URU 
E
NERGY
 
Ms. Umida Rozumbetova - Head of Team E&S 
Mr. Makhmudov Askarbek 
– Social Consultant 
M
ATERIALS USED
 
n/a 
COVID-19
 
P
RECAUTION 
I
MPLEMENTED
 
Online meeting instead of organising a physical meeting. 
M
AIN 
O
UTCOMES
 
Pasture Development Association: What is the size of the land where the Projects are going to be 
constructed (this is in reference to both Dzhankeldy Wind Farm and Bash Wind Farm (subject of 
a separate ESIA))? Will it be 1,100ha? 
ACWA Power: No. The Dzhankeldy Wind Farm has been allocated about 280ha and Bash Wind 
Farm has been allocated about 284ha. However, not all this land will be utilised and the Project 
boundary will not be fenced which will allow grazing to continue after construction. Based on 
safety measures it will only be necessary to fence the substations and consider the required buffer 
zones. 
Pasture Development Association: On a legal aspect did our Committee give consent for issuing 
land lease orders by local municipalities? 
ACWA Power: No, we only have a copy of the letter sent by the Committee to Bukhara Region 
Municipality in 2020. ACWA Power signed a PPA with NEGU and an investment agreement with 
the Ministry of Foreign Affairs, Trade and Investment. To execute these signed agreements 
Presidential Decrees were issued for both Projects.
In addition, Bukhara Regional Municipality was obliged by Presidential Decrees to make lease 
agreements and allocate the land for the Projects.
Pasture Development Association: Yes, the order of the investment procedure is right. However, 
local municipalities as well as regional ones have no legal right to allocate land and issue 
agreements because the land is leased to the Committee. 
ACWA Power: ACWA Power will sign the lease agreements with the organisation that has the 
rights to the land. We acted based on the instructions given in the Presidential Decree and 
therein the Bukhara Regional Municipality is referenced. 

Download 6.64 Mb.

Do'stlaringiz bilan baham:
1   ...   15   16   17   18   19   20   21   22   ...   203




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling