Dzhankeldy 500MW Wind Farm
ESIA Volume 2- Main Text, Tables & Figures
43
Figure 2-9 Dzhankeldy-Bash OHTL Alignment Within Konimekh District (Ref. Blue Line
for Section Leased by Qaraqo’ta LLC)
2.2.2.2
Land Lease
As
earlier discussed, ACWA Power will transfer the operation of the OHTL to NEGU after
completion of the construction phase. As such, ACWA Power will only be granted
land usage
rights during the construction phase of the OHTL and the required
land will be allocated to
NEGU on a permanent basis through a government decree. It is understood from the Client
that the allocation of land to NEGU will be undertaken once the required land is taken into
state reserve. This process is still ongoing.
2.2.2.3
Land Use and Site Condition
As observed during a site reconnaissance visit undertaken in April and May 2021, the 128.5km
OHTL route is located in the central part of the Kyzylkum desert and lies on the flat part of the
northern foothills of the Kuljuktau Range. From the Project site, this proposed OHTL route runs
along/parallel to a local asphalt road (called Zarafshan-Navoi road) that connects the village
of Dzhankeldy
to the village of Chontabay, Chengeldy, Karakata and Baloakarak
approximately 140m, 3.7km, 6.1km and 10km north of the OHTL respectively.
Where the local asphalt road ends, the proposed OHTL route runs further across the hills from
the Darbaza to the Kafirtepa Hill after which it crosses and runs parallel to an existing 220kV
high voltage transmission line that runs through the Bash site from north to south east. The
proposed OHTL also crosses the Navoi-Uchkuduk railway that runs through the Bash site.
Dzhankeldy 500MW Wind Farm
ESIA Volume 2- Main Text, Tables & Figures
44