Project Management in the Oil and Gas Industry
Quality Control in the Design Phase
Download 1.92 Mb. Pdf ko'rish
|
2.Project management in the oil and gas industry 2016
- Bu sahifa navigatsiya:
- Figure 5.11
5.11 Quality Control in the Design Phase
The purpose of this phase is to develop the required procedures to ensure that the design will be identical to the client’s needs. After the owner and engineering office on contract sign the final con- tract, the head office will select a project manager who will have direct responsibility for the project. Figure 5.11 Document movement. Distribute to departments Top management Does it need action? Deputy chairman Follow up Finish issue Action Does work finish? Special for chairman Copies Save in file No Yes No yes No yes Fax Normal dept. Resource Hiring 165 The main role of the office manager or general manager of the company is to verify customer satisfaction and follow up with the progress of work. Each project manager and general manager should determine the depart- ments that will design work and should send letters to these departments to clarify what the project objectives are. The project manager and the planning engineer have to specify the number of drawings required and the number of working hours and the work schedule of the project, which is determined by Form (2a). The project manager will submit form (1a) to the heads of departments and the work file to the project to record data in a form (7a). Before starting the design, the department head should determine the work plan using Form (3a), which contains a plan of action and the names of teams and estimates the number of working hours, the number of draw- ings required, and the foundations of design. The responsibility of the project manager and planning engineer is to follow-up with the performance of all departments. The project manager and the planning engineer should start the preparation of the final time schedule after receiving schedules from all departments involved in this project. One of the responsibilities of the project manager in the main office and the construction manager on site is to schedule meetings between the relevant departments for discussion or review of all departments and make sure that information is circulated between departments regularly and properly. It should fall to management to identify the engineer respon- sible for design, who gives approval of the drawings, and the Director of Administration should pursue his design through the timetable that has been prepared and sent to the Project Manager through the previous form (3a). In the start-up phase, before the signing of the contract or in the ten- dering phase, the project manager should hold a meeting for all the disci- plines, as with lead, civil, mechanical, piping, and others. In most cases, the client sends information to the engineering office, usually the SOR, original drawings, or scope of work. The project manager then distributes a copy of these documents to all the discipline leads. In oil and gas projects, there should be good communication between the main departments, which are usually the civil and piping departments. However, if the document is read by every discipline separately, every discipline may understand or interpret a paragraph differently. It is pre- ferred that the project manager explains the project to the different disci- plines and transfers the client requirements and expectations clearly to all the disciplines. |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling