Project Management in the Oil and Gas Industry
Download 1.92 Mb. Pdf ko'rish
|
2.Project management in the oil and gas industry 2016
1
5 Comm.& start up 2 Mob. Table 5.2 Resources allocated to the activities. No. Activity D Earliest Latest Float Resources per day Total resources ES EF LS LF TF FF 100 Mobilization 3 0 3 0 3 0 0 4 12 200 Excavation 8 3 11 3 11 0 0 7 56 300 Pouring concrete foundation and piping support 10 11 21 11 21 0 0 4 40 400 Install piping 4 3 7 14 18 11 11 5 20 500 Install the mechanical package 1 21 22 21 22 0 0 4 4 600 Put the grouting 1 22 23 22 23 0 0 4 4 700 Connect the piping 5 7 12 18 23 11 11 5 25 800 Commissioning and start up 2 23 25 23 25 0 0 6 12 Total projects man days 173 160 Project Management in the Oil and Gas Industry Figure 5.6 shows the distribution of the time duration of this project which is 25 days. When summing the total number of working days, as shown in Table 5.2, it will be 173 working days. Figure 5.7 presents the time schedule and the number of employees. If the plan is presented by the early start, it means all activity will start in its first time to start. In the bottom of the schedule, the other option is to do all the activity in the latest start time, which means all the activity which is not on the critical path will be starting at its latest time. In our example here, the two activities are 400 and 700 for installing the piping and connecting the piping, respectively. In the first case, the maximum number of persons on site will be twelve, whereas in the second option, for the latest start, the maxi- mum will be nine persons. Therefore, a decision needs to be made on whether to use the total float or free float to achieve the project target. In normal cases, if the number of laborers will be less, the impact will be good, but if there is an increase in the laborers, the probability of incidents and injury will increase. We can look at it from another view as in remote areas, which are normal in the case of oil and gas projects, the accom- modation will be difficult and expensive. So, if you maintain a minimum number of employees, it will have a good impact on the cost and, in some cases, it will be a constraint if the client provides accommodation for only ten persons per day. In the case of the engineering design office, it is important to distrib- ute the work load, as it will be very good to not hire engineers to work for part time for only six month, rather than hire the full time engineers. Distributing the work load by this philosophy is very beneficial Download 1.92 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling