Resource Hiring 159
itself and the overall time. An activity can move through itself without
affecting the overall time for the project and it is
presented in the table
by the total floating time (TF). The column of the resources shows the
number of personnel required
for each activity per day, while the last
column shows the total number of days required for each activity. For
example, in Table 5.2 excavation needs seven
workers per day and work
will last for eight days, so this activity needs 56
working days in order
to be achieved.
Figure 5.6 Preceding diagram define the critical path.
100
600
200
400
3
7
14
18
7
12
18
23
0
3
0
3
3
11
3
11
11
21
11
21
21
22
21
22
22
23
22
23
23
25
23
25
300
500
700
800
Pouring concrete
Excavate
Install piping
Mech. package
Put
grouting
Conn. piping
3
1
8
4
10