A summary of Line 1 is as provided below. 
Table 2-11 Summary of the OHTL Route between Dzhankeldy - Bash (Line 1) 
E
LEMENT
 
D
ESCRIPTION
 
Name of the OHTL 
33/500kV Bash WPP to 33/500 
Dzhankeldy substation 
Length
127.05km 
No of point of intersection 
31 
Number of transmission line crossing

Number of railway crossing 

Number of pipeline crossing

Number of highway crossing 

Number of small road crossings 

Number of irrigation ditch crossing 

Source: Pre-feasibility Study for 500kV Transmission Lines (draft), 2021 
L
INE 
2
 
(V
IOLET
L
INE

A summary of Line 2 is as provided below. 
Table 2-12 Summary of the OHTL Route between Dzhankeldy - Bash (Line 2) 
E
LEMENT
 
D
ESCRIPTION
 
Name of the OHTL 
33/500kV Bash WPP to 33/500 
Dzhankeldy substation 
Length
127.44km 
No of point of intersection 
18 
Number of transmission line crossing

Number of railway crossing 

Number of pipeline crossing

Number of highway crossing 

Number of small road crossings 

Number of irrigation ditch crossing 

Source: Pre-feasibility Study for 500kV Transmission Lines (draft), 2021 
L
INE 
3
 
(B
LUE 

Download 6.64 Mb.

Do'stlaringiz bilan baham:
1   ...   59   60   61   62   63   64   65   66   ...   203




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling