Dzhankeldy Wind Power Project
Download 6.64 Mb. Pdf ko'rish
|
56086-001-esia-en
- Bu sahifa navigatsiya:
- Figure 2-46 IBAs found within 1km, 10km 50km of the OHTL
ESCRIPTION
Name of the OHTL 33/500kV Bash WPP to existing 500kV Karakul substation Length 162.260km No of points of intersections 18 Number of transmission line crossings 8 Number of intersections of the design transmission line 1 Number of railway line crossings 3 Number of pipeline crossings 4 Number of highway crossings 2 Number of small road crossings 4 Number of canal/irrigation ditch crossings 13 Source: Pre-feasibility Study for 500kV Transmission Lines (draft), 2021 Environmental & Social Aspects According to the pre-feasibility study, the 162km OHTL is found within a 50km of IBAs as shown in the figure below. The closest IBA site is lake Ayakagitma at approximately 6.7km to the north west of the OHTL. Additional ecological studies (i.e., herpetological, invertebrates, botanical and ornithological surveys) along the OHTL have been undertaken under the Bash 500MW Wind Farm ESIA (subject of a separate ESIA). Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 97 Figure 2-46 IBAs found within 1km, 10km & 50km of the OHTL Source: Pre-feasibility Study for 500kV Transmission Lines (draft), 2021 The proposed Line 1 (green) crosses through four agricultural lands owned by local farmers and on the eastern border of land belonging to Qirobod Mavjlari LLC and Kumush Kalava LLC but this land will not be impacted. Line 2 (violet) crosses through five agricultural lands and would not have any impact on other social infrastructure located near or around the Karakul sub-station (ACWA Power, 2021). Impacts on the Project Affected Persons (PAPs) are assessed on the Project-specific Resettlement Action Framework (RAF) and Resettlement Action Plan (RAP). Based on the above factors and in order to avoid residential areas, community structures/facilities and agricultural areas as far as practicable, the pre-feasibility study recommends that Line 1 is the best alignment between Bash to Karakul due to the limited number of crossings. In August 2021, this OHTL Line 1 was slightly revised to avoid small farmlands along the route as far as practicable and to ensure the line connects to the available spare bay at Karakul substation. The proposed Dzhanekldy – Bash – Kurakul OHTL alignment was submitted to NEGU by ACWA Power and is as shown in the figure below. Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 98 Download 6.64 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling