56086-001-esia-en

2.8.6.2
Bash to Kurakul OHTL 
L
INE 
1
 
(
 
G
REEN
L
INE

The proposed 500kV OHTL will start from the Bash Wind Farm to the exiting 500kV Karakul 
substation. The proposed corridor goes through plain desert areas and through approximately 
15-18km of irrigated land (about 13% of the total OHTL). The summary of the route is as 
provided below. 
Table 2-14 Summary of the OHTL Route between Bash 
– Kurakul (Line 1) 
E
LEMENT
 
D
ESCRIPTION
 
Name of the OHTL 
33/500kV Bash WPP to existing 500kV 
Karakul substation 
Length
162km 
No of point of intersection 
32 
Number of transmission line crossings

Number of railway line crossings 

Number of pipeline crossings 

Number of highway crossings 

Number of small road crossings 

Number of canal/irrigation ditch crossings 

Source: Pre-feasibility Study for 500kV Transmission Lines (draft), 2021 
 


Dzhankeldy 500MW Wind Farm 
ESIA Volume 2- Main Text, Tables & Figures 
96 
L
INE 
2
 
(V
IOLET
L
INE

The proposed corridor goes through plain desert areas and through approximately 15-18km of 
irrigated land (about 10% of the total OHTL). The summary of the route is as provided below. 
Table 2-15 Summary of the OHTL Route between Bash 
– Kurakul (Line 2) 
E
LEMENT
 
D

Download 6.64 Mb.

Do'stlaringiz bilan baham:
1   ...   61   62   63   64   65   66   67   68   ...   203




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling